Build your dream home on this prime piece of real estate where the critical engineering groundwork has already been completed. Located at 338 East Landing Street in Lumberton Township, this spacious lot (Block 20.17, Lot 27.08) is ready for a builder to step in and get started. Comprehensive engineering and drainage plans have been professionally prepared by Peterman Maxcy Associates, LLC, saving you months of preparation time. Key Engineering Work and Site Improvements Completed: Fully Developed Drainage Plans: Detailed post-development drainage plans are already in place. Stormwater Management Design: The plans feature engineered infiltration basins, specifically designed to handle current and future rainfall depths. Utility and Site Access: Driveway apron has already been cut, and PSE&G easements have been clearly identified. Reserved Septic Areas: Septic system area has been reserved. Soil and Safety Analysis: Professional test pits have been completed, confirming infiltration rates, and the design includes a 20-foot emergency spillway for superior site safety. Site Layout: Proposed dwelling footprints have already been identified on the plans, allowing you to visualize exactly where your new home will sit on this beautiful property. Financials: Roll back taxes have been paid in full. Skip the uncertainty of the early planning phases and move straight toward your build with  a site that has been meticulously analyzed and engineered for success.   (The estimated per year amounts could change slightly depending on the 2026 Tax Rate issued this July)